IAC logo
IAC Assessment: OK0047
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1982
Principal Product FABRICATED STEEL PDTS.
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 480
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 0
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $160,557 3,927,608 kWh $0.04
Natural Gas $42,115 13,303 MMBtu $3.17
TOTAL ENERGY COSTS $202,672
RECOMMENDED SAVINGS* $45,646 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,188
Cost:
$7,040
- - $2,188 730 -
-
kWh
$2,188
730
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,056
Cost:
$372
- - $3,056 1,019 -
-
kWh
$3,056
1,019
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$417
Cost:
$300
- - $417 139 -
-
kWh
$417
139
MMBtu
04: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$903
Cost:
$462
- - $903 301 -
-
kWh
$903
301
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$39,082
Cost:
$28,910
$39,082 1,003,810 - - $39,082
1,003,810
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$45,646
Cost:
$37,084
$39,082 1,003,810 $6,564 2,189 $39,082
1,003,810
kWh
$6,564
2,189
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas