IAC logo
IAC Assessment: OK0057
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0057
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1982
Principal Product WOOD & METAL FENCE
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,153 1,871,043 kWh $0.08
Natural Gas $70,645 25,838 MMBtu $2.73
TOTAL ENERGY COSTS $211,798
RECOMMENDED SAVINGS* $45,147 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,936
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$761
Cost:
$2,402
$761 10,551 - - $761
10,551
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$12,500
Cost:
$500
- - $12,500 5,435 -
-
kWh
$12,500
5,435
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$20,704
Cost:
$36,360
$20,704 - - - $20,704
-
kWh
-
-
MMBtu
04: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$6,450
Cost:
$19,800
$6,450 - - - $6,450
-
kWh
-
-
MMBtu
05: 2.2514 COVER OPEN TANKS Savings:
$640
Cost:
$655
- - $640 278 -
-
kWh
$640
278
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,092
Cost:
$1,100
$4,092 120,164 - - $4,092
120,164
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$45,147
Cost:
$60,817
$32,007 130,715 $13,140 5,713 $32,007
130,715
kWh
$13,140
5,713
MMBtu
TOTAL IMPLEMENTED Savings:
$37,936
Cost:
$38,615
$24,796 120,164 $13,140 5,713 $24,796
120,164
kWh
$13,140
5,713
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas