IAC Assessment: OK0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1982
Principal Product AUTO-LEAFSPRINGS
NAICS n/a
SIC 3493 - Steel Springs, Except Wire
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 0
Annual Production 100,000 Pieces
Production Hrs. Annual 2,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $7,019 126,319 kWh $0.06
Natural Gas $16,507 5,993 MMBtu $2.75
TOTAL ENERGY COSTS $23,526
RECOMMENDED SAVINGS* $3,548 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,327
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$473
Cost:
$283
$473 8,206 - - $473
8,206
kWh
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$204
Cost:
$600
- - $204 66 -
-
kWh
$204
66
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$122
Cost:
-
$122 2,052 - - $122
2,052
kWh
-
-
MMBtu
04: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$230
Cost:
$1,137
- - $230 74 -
-
kWh
$230
74
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$422
Cost:
$500
- - $422 155 -
-
kWh
$422
155
MMBtu
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$2,097
Cost:
$984
- - $2,097 677 -
-
kWh
$2,097
677
MMBtu
TOTAL RECOMMENDED Savings:
$3,548
Cost:
$3,504
$595 10,258 $2,953 972 $595
10,258
kWh
$2,953
972
MMBtu
TOTAL IMPLEMENTED Savings:
$2,327
Cost:
$2,121
- - $2,327 751 -
-
kWh
$2,327
751
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas