Assessment Year 1982
Principal Product CONTROLS FOR INDUSTRIES
NAICS n/a
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 300 Pieces
Production Hrs. Annual 4,225
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,216 3,596,131 kWh $0.04
Natural Gas $13,237 4,998 MMBtu $2.65
TOTAL ENERGY COSTS $151,453
RECOMMENDED SAVINGS* $79,774 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,156
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,333
Cost:
$19,254
$8,333 190,211 $8,333
190,211
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$46
Cost:
$9
$46 1,172 $46
1,172
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$647
Cost:
$997
$647 12,603 $647
12,603
kWh
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,156
Cost:
$155
$8,156 220,399 $8,156
220,399
kWh
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$57,720
Cost:
$28,000
$57,720 1,564,478 $57,720
1,564,478
kWh
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,805
Cost:
$1,112
$1,805 47,479 $1,805
47,479
kWh
07: 2.7314 REDUCE VENTILATION AIR Savings:
$487
Cost:
$235
$487 13,189 $487
13,189
kWh
08: 2.7422 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT Savings:
$2,580
Cost:
$4,765
$2,580 69,754 $2,580
69,754
kWh
TOTAL RECOMMENDED Savings:
$79,774
Cost:
$54,527
$79,774 2,119,285 $79,774
2,119,285
kWh
TOTAL IMPLEMENTED Savings:
$8,156
Cost:
$155
$8,156 220,399 $8,156
220,399
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage