IAC Assessment: OK0064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1982
Principal Product BUTTERFLY VALVES
NAICS n/a
SIC 3494 - Valves And Pipe Fittings, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 70,000 Pieces
Production Hrs. Annual 3,400
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,700 1,465,123 kWh $0.04
Natural Gas $45,000 15,000 MMBtu $3.00
TOTAL ENERGY COSTS $105,700
RECOMMENDED SAVINGS* $6,687 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,687
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$707
Cost:
$56
$707 21,102 - - $707
21,102
kWh
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,830
Cost:
$400
$1,830 54,807 - - $1,830
54,807
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,330
Cost:
$1,405
$1,330 24,033 - - $1,330
24,033
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,749
Cost:
$560
- - $1,749 535 -
-
kWh
$1,749
535
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$485
Cost:
-
- - $485 149 -
-
kWh
$485
149
MMBtu
06: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY Savings:
$586
Cost:
-
$586 17,585 - - $586
17,585
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,687
Cost:
$2,421
$4,453 117,527 $2,234 684 $4,453
117,527
kWh
$2,234
684
MMBtu
TOTAL IMPLEMENTED Savings:
$6,687
Cost:
$2,421
$4,453 117,527 $2,234 684 $4,453
117,527
kWh
$2,234
684
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas