IAC logo
IAC Assessment: OK0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product PIPE HANDLING EQUIPMENT
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,375
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,445 2,630,129 kWh $0.04
Natural Gas $30,688 10,986 MMBtu $2.79
TOTAL ENERGY COSTS $129,133
RECOMMENDED SAVINGS* $25,808 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,932
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,147
Cost:
$3,280
$1,147 - - - $1,147
-
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,406
Cost:
$180
$3,406 118,406 - - $3,406
118,406
kWh
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$470
Cost:
-
$470 16,413 - - $470
16,413
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$18,782
Cost:
$1,129
- - $18,782 5,815 -
-
kWh
$18,782
5,815
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,033
Cost:
$824
$1,033 20,223 - - $1,033
20,223
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$970
Cost:
$351
$970 18,757 - - $970
18,757
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$25,808
Cost:
$5,764
$7,026 173,799 $18,782 5,815 $7,026
173,799
kWh
$18,782
5,815
MMBtu
TOTAL IMPLEMENTED Savings:
$21,932
Cost:
$5,584
$3,150 38,980 $18,782 5,815 $3,150
38,980
kWh
$18,782
5,815
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas