IAC Assessment: OK0087
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0087
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product HEAT TRANSFER EQUIPMENT
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,819 701,055 kWh $0.05
Natural Gas $44,816 13,413 MMBtu $3.34
TOTAL ENERGY COSTS $80,635
RECOMMENDED SAVINGS* $8,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,133
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$118
Cost:
$120
$118 3,810 $118
3,810
kWh
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$42
Cost:
-
$42 1,465 $42
1,465
kWh
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,133
Cost:
$250
$5,133 160,317 $5,133
160,317
kWh
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,062
Cost:
$3,740
$1,062 21,395 $1,062
21,395
kWh
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$942
Cost:
$4,420
$942 22,567 $942
22,567
kWh
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$769
Cost:
$757
$769 15,240 $769
15,240
kWh
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$210
Cost:
$13
$210 4,103 $210
4,103
kWh
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$114
Cost:
$326
$114 3,810 $114
3,810
kWh
TOTAL RECOMMENDED Savings:
$8,390
Cost:
$9,626
$8,390 232,707 $8,390
232,707
kWh
TOTAL IMPLEMENTED Savings:
$5,133
Cost:
$250
$5,133 160,317 $5,133
160,317
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage