IAC Assessment: OK0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product MEAT,HOT LINKS,SAUSAGE
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $1,000,000-$5,000,000
# of Employees 56
Plant Area (Sq.Ft.) 0
Annual Production 8,750,000 Pounds
Production Hrs. Annual 2,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,407 1,395,076 kWh $0.04
Natural Gas $41,888 13,230 MMBtu $3.17
TOTAL ENERGY COSTS $103,295
RECOMMENDED SAVINGS* $9,509 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,246
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$297
Cost:
$318
$297 5,275 - - $297
5,275
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$865
Cost:
-
$865 15,533 - - $865
15,533
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,949
Cost:
$725
- - $2,949 903 -
-
kWh
$2,949
903
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,615
Cost:
$600
- - $4,615 1,431 -
-
kWh
$4,615
1,431
MMBtu
05: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$184
Cost:
$785
- - $184 57 -
-
kWh
$184
57
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$359
Cost:
$1,700
$359 11,723 - - $359
11,723
kWh
-
-
MMBtu
07: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$240
Cost:
$97
- - $240 74 -
-
kWh
$240
74
MMBtu
TOTAL RECOMMENDED Savings:
$9,509
Cost:
$4,225
$1,521 32,531 $7,988 2,465 $1,521
32,531
kWh
$7,988
2,465
MMBtu
TOTAL IMPLEMENTED Savings:
$3,246
Cost:
$1,043
$297 5,275 $2,949 903 $297
5,275
kWh
$2,949
903
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas