IAC logo
IAC Assessment: OK0107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product OIL FIELD PUMPS
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 3,000 Pieces
Production Hrs. Annual 4,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,257 1,993,845 kWh $0.05
Natural Gas $12,123 3,299 MMBtu $3.67
TOTAL ENERGY COSTS $113,380
RECOMMENDED SAVINGS* $25,944 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,944
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,492
Cost:
$5,215
$1,492 - - - $1,492
-
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,222
Cost:
$34,425
$12,222 269,930 - - $12,222
269,930
kWh
-
-
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,270
Cost:
$2,875
$2,291 72,685 $1,979 455 $2,291
72,685
kWh
$1,979
455
MMBtu
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,147
Cost:
$850
$2,429 73,564 $2,718 625 $2,429
73,564
kWh
$2,718
625
MMBtu
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,813
Cost:
$2,000
$2,813 85,287 - - $2,813
85,287
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$25,944
Cost:
$45,365
$21,247 501,466 $4,697 1,080 $21,247
501,466
kWh
$4,697
1,080
MMBtu
TOTAL IMPLEMENTED Savings:
$25,944
Cost:
$45,365
$21,247 501,466 $4,697 1,080 $21,247
501,466
kWh
$4,697
1,080
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas