IAC Assessment: OK0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product PORCELAIN WALL PANELS
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 8,000 Thousand Feet
Production Hrs. Annual 5,250
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,579 2,216,882 kWh $0.05
Natural Gas $188,702 55,078 MMBtu $3.43
TOTAL ENERGY COSTS $291,281
RECOMMENDED SAVINGS* $22,957 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,361
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$3,912
Cost:
$11,990
- - $3,912 1,130 -
-
kWh
$3,912
1,130
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,027
Cost:
$700
- - $5,027 1,452 -
-
kWh
$5,027
1,452
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,117
Cost:
$22,000
$13,117 325,615 - - $13,117
325,615
kWh
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$596
Cost:
$1,640
$596 - - - $596
-
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$203
Cost:
$296
- - $203 59 -
-
kWh
$203
59
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$102
Cost:
$142
$102 2,052 - - $102
2,052
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,957
Cost:
$36,768
$13,815 327,667 $9,142 2,641 $13,815
327,667
kWh
$9,142
2,641
MMBtu
TOTAL IMPLEMENTED Savings:
$22,361
Cost:
$35,128
$13,219 327,667 $9,142 2,641 $13,219
327,667
kWh
$9,142
2,641
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas