IAC logo
IAC Assessment: OK0118
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0118
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product STEEL BUMPERS
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 36,000 Pieces
Production Hrs. Annual 4,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,525 636,577 kWh $0.06
Natural Gas $18,149 4,732 MMBtu $3.84
TOTAL ENERGY COSTS $54,674
RECOMMENDED SAVINGS* $9,953 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2514 COVER OPEN TANKS Savings:
$1,452
Cost:
$545
- - $1,452 444 -
-
kWh
$1,452
444
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,261
Cost:
$460
- - $1,261 386 -
-
kWh
$1,261
386
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$281
Cost:
$59
- - $281 86 -
-
kWh
$281
86
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,730
Cost:
$2,046
- - $6,730 2,059 -
-
kWh
$6,730
2,059
MMBtu
05: 2.7422 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT Savings:
$90
Cost:
$208
$90 2,638 - - $90
2,638
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$51
Cost:
$53
$51 879 - - $51
879
kWh
-
-
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$88
Cost:
$27
$88 2,638 - - $88
2,638
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,953
Cost:
$3,398
$229 6,155 $9,724 2,975 $229
6,155
kWh
$9,724
2,975
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas