IAC Assessment: OK0121
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0121
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product REBAR, FENCE POSTS
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Tons
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $6,448,100 140,364,891 kWh $0.05
Natural Gas $2,154,200 637,401 MMBtu $3.38
TOTAL ENERGY COSTS $8,602,300
RECOMMENDED SAVINGS* $389,222 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,850
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,384
Cost:
$2,880
$1,384 41,032 - - - - $1,384
41,032
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,065
Cost:
-
$2,065 52,169 - - - - $2,065
52,169
kWh
-
-
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$557
Cost:
$650
- - $557 165 - - -
-
kWh
$557
165
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$58,510
Cost:
$174,400
$62,460 1,580,891 - - $(-3,950) - $62,460
1,580,891
kWh
-
-
MMBtu
$(-3,950)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,956
Cost:
$928
$2,956 76,202 - - - - $2,956
76,202
kWh
-
-
MMBtu
-
-
$
06: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$323,750
Cost:
$847,440
$513,750 12,168,816 - - $(-190,000) - $513,750
12,168,816
kWh
-
-
MMBtu
$(-190,000)
-
$
TOTAL RECOMMENDED Savings:
$389,222
Cost:
$1,026,298
$582,615 13,919,110 $557 165 $(-193,950) - $582,615
13,919,110
kWh
$557
165
MMBtu
$(-193,950)
-
$
TOTAL IMPLEMENTED Savings:
$62,850
Cost:
$178,208
$66,800 1,698,125 - - $(-3,950) - $66,800
1,698,125
kWh
-
-
MMBtu
$(-3,950)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes