IAC logo
IAC Assessment: OK0129
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product OIL RESEARCH VEHICLES
NAICS n/a
SIC 3531 - Construction Machinery
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 50 Pieces
Production Hrs. Annual 2,500
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,738 446,659 kWh $0.03
Natural Gas $24,932 3,495 MMBtu $7.13
TOTAL ENERGY COSTS $39,670
RECOMMENDED SAVINGS* $6,609 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,246
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.5123 REDUCE FLUID FLOW RATES Savings:
$4,300
Cost:
$3,000
- - $4,300 1,031 -
-
kWh
$4,300
1,031
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,080
Cost:
$900
- - $1,080 257 -
-
kWh
$1,080
257
MMBtu
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$294
Cost:
$200
- - $294 70 -
-
kWh
$294
70
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$676
Cost:
$306
$676 13,775 - - $676
13,775
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$34
Cost:
$27
$34 1,172 - - $34
1,172
kWh
-
-
MMBtu
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$162
Cost:
$110
$162 5,569 - - $162
5,569
kWh
-
-
MMBtu
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$63
Cost:
$10
$63 1,172 - - $63
1,172
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,609
Cost:
$4,553
$935 21,688 $5,674 1,358 $935
21,688
kWh
$5,674
1,358
MMBtu
TOTAL IMPLEMENTED Savings:
$2,246
Cost:
$1,543
$872 20,516 $1,374 327 $872
20,516
kWh
$1,374
327
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas