IAC Assessment: OK0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product ASPHALT PAVING MATERIAL
NAICS n/a
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $1,000,000-$5,000,000
# of Employees 5
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Tons
Production Hrs. Annual 2,860
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,471 1,082,063 kWh $0.06
Natural Gas $254,805 73,926 MMBtu $3.45
TOTAL ENERGY COSTS $321,276
RECOMMENDED SAVINGS* $160,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $98,321
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$86,486
Cost:
$28,000
- - $86,486 23,760 - - -
-
kWh
$86,486
23,760
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,495
Cost:
$450
- - $1,615 444 $(-120) - -
-
kWh
$1,615
444
MMBtu
$(-120)
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,684
Cost:
$816
- - $11,684 3,210 - - -
-
kWh
$11,684
3,210
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,213
Cost:
$5,058
- - $4,213 1,157 - - -
-
kWh
$4,213
1,157
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$15
Cost:
$33
- - $15 4 - - -
-
kWh
$15
4
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$181
Cost:
-
$181 3,224 - - - - $181
3,224
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$38
Cost:
$25
$38 586 - - - - $38
586
kWh
-
-
MMBtu
-
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$56,217
Cost:
$125,000
- - $56,217 15,444 - - -
-
kWh
$56,217
15,444
MMBtu
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$98
Cost:
$500
- - $98 27 - - -
-
kWh
$98
27
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$160,427
Cost:
$159,882
$219 3,810 $160,328 44,046 $(-120) - $219
3,810
kWh
$160,328
44,046
MMBtu
$(-120)
-
$
TOTAL IMPLEMENTED Savings:
$98,321
Cost:
$29,374
$38 586 $98,283 27,001 - - $38
586
kWh
$98,283
27,001
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes