IAC logo
IAC Assessment: OK0134
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0134
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product METAL FABRICATION
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 300,000 Pounds
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $6,329 97,890 kWh $0.06
Natural Gas $3,352 795 MMBtu $4.22
TOTAL ENERGY COSTS $9,681
RECOMMENDED SAVINGS* $948 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $948
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$236
Cost:
-
$213 4,103 - - $23 - $213
4,103
kWh
-
-
MMBtu
$23
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$68
Cost:
$118
$68 1,172 - - - - $68
1,172
kWh
-
-
MMBtu
-
-
$
03: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$84
Cost:
$240
$55 1,172 $29 8 - - $55
1,172
kWh
$29
8
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$42
Cost:
$35
$42 879 - - - - $42
879
kWh
-
-
MMBtu
-
-
$
05: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$21
Cost:
$60
$21 293 - - - - $21
293
kWh
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$497
Cost:
$550
- - $497 135 - - -
-
kWh
$497
135
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$948
Cost:
$1,003
$399 7,619 $526 143 $23 - $399
7,619
kWh
$526
143
MMBtu
$23
-
$
TOTAL IMPLEMENTED Savings:
$948
Cost:
$1,003
$399 7,619 $526 143 $23 - $399
7,619
kWh
$526
143
MMBtu
$23
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes