IAC logo
IAC Assessment: OK0135
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0135
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product PRINTED CIRCUIT BOARDS
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 50,000 Pieces
Production Hrs. Annual 3,175
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,861 825,909 kWh $0.05
Natural Gas $3,017 663 MMBtu $4.55
TOTAL ENERGY COSTS $47,878
RECOMMENDED SAVINGS* $3,192 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,909
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,133
Cost:
$856
$1,133 24,326 - - - - $1,133
24,326
kWh
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$190
Cost:
$226
$190 4,103 - - - - $190
4,103
kWh
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$207
Cost:
$198
- - $207 62 - - -
-
kWh
$207
62
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$338
Cost:
$596
$219 5,862 - - $119 - $219
5,862
kWh
-
-
MMBtu
$119
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$505
Cost:
$344
- - $505 151 - - -
-
kWh
$505
151
MMBtu
-
-
$
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$588
Cost:
$1,228
$588 19,930 - - - - $588
19,930
kWh
-
-
MMBtu
-
-
$
07: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$40
Cost:
$50
$40 1,465 - - - - $40
1,465
kWh
-
-
MMBtu
-
-
$
08: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$191
Cost:
$440
- - $191 57 - - -
-
kWh
$191
57
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$3,192
Cost:
$3,938
$2,170 55,686 $903 270 $119 - $2,170
55,686
kWh
$903
270
MMBtu
$119
-
$
TOTAL IMPLEMENTED Savings:
$1,909
Cost:
$2,140
$1,392 31,653 $398 119 $119 - $1,392
31,653
kWh
$398
119
MMBtu
$119
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes