IAC logo
IAC Assessment: OK0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product IRON CASTING
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 0
Annual Production 2,400 Tons
Production Hrs. Annual 4,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,822 2,863,130 kWh $0.05
Natural Gas $27,827 7,320 MMBtu $3.80
TOTAL ENERGY COSTS $163,649
RECOMMENDED SAVINGS* $1,938 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$90
Cost:
$325
- - $90 28 -
-
kWh
$90
28
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$519
Cost:
$115
$519 9,965 - - $519
9,965
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$429
Cost:
$130
$429 8,206 - - $429
8,206
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$626
Cost:
$135
$626 12,016 - - $626
12,016
kWh
-
-
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$222
Cost:
-
- - $222 68 -
-
kWh
$222
68
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$52
Cost:
$180
$52 1,465 - - $52
1,465
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$1,938
Cost:
$885
$1,626 31,652 $312 96 $1,626
31,652
kWh
$312
96
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas