IAC Assessment: OK0146
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0146
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product PIPELINE PARTS
NAICS n/a
SIC 3519 - Internal Combustion Engines, Nec
Sales $1,000,000-$5,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 5,330
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,067 1,065,944 kWh $0.05
Natural Gas $28,276 7,574 MMBtu $3.73
TOTAL ENERGY COSTS $83,343
RECOMMENDED SAVINGS* $9,953 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,049
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$142
Cost:
$525
- - $142 43 - - -
-
kWh
$142
43
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$176
Cost:
$450
$176 4,396 - - - - $176
4,396
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$28
Cost:
-
$28 586 - - - - $28
586
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$50
Cost:
$46
$50 1,172 - - - - $50
1,172
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$234
Cost:
-
$207 5,275 - - $27 - $207
5,275
kWh
-
-
MMBtu
$27
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,352
Cost:
$13,552
$6,790 169,695 - - $562 - $6,790
169,695
kWh
-
-
MMBtu
$562
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,971
Cost:
$204
$1,702 42,497 $269 81 - - $1,702
42,497
kWh
$269
81
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,953
Cost:
$14,777
$8,953 223,621 $411 124 $589 - $8,953
223,621
kWh
$411
124
MMBtu
$589
-
$
TOTAL IMPLEMENTED Savings:
$2,049
Cost:
$250
$1,780 44,255 $269 81 - - $1,780
44,255
kWh
$269
81
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes