IAC logo
IAC Assessment: OK0151
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0151
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product VACUUM TANKS
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 650 Pieces
Production Hrs. Annual 2,730
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,035 266,999 kWh $0.08
Natural Gas $19,190 3,806 MMBtu $5.04
TOTAL ENERGY COSTS $40,225
RECOMMENDED SAVINGS* $6,009 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,025
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,492
Cost:
$1,100
- - $4,492 891 -
-
kWh
$4,492
891
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$58
Cost:
$48
$58 1,465 - - $58
1,465
kWh
-
-
MMBtu
03: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$141
Cost:
$336
$141 3,224 - - $141
3,224
kWh
-
-
MMBtu
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$334
Cost:
-
$334 7,620 - - $334
7,620
kWh
-
-
MMBtu
05: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY Savings:
$984
Cost:
-
$984 - - - $984
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,009
Cost:
$1,484
$1,517 12,309 $4,492 891 $1,517
12,309
kWh
$4,492
891
MMBtu
TOTAL IMPLEMENTED Savings:
$5,025
Cost:
$1,484
$533 12,309 $4,492 891 $533
12,309
kWh
$4,492
891
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas