IAC logo
IAC Assessment: OK0162
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0162
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1985
Principal Product WELDED FITTINGS
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $5,000,000-$10,000,000
# of Employees 63
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 0
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,890 2,084,408 kWh $0.05
Natural Gas $301,549 85,792 MMBtu $3.51
TOTAL ENERGY COSTS $413,439
RECOMMENDED SAVINGS* $13,008 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,361
Cost:
$1,022
- - $6,361 1,648 -
-
kWh
$6,361
1,648
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$900
Cost:
$2,355
$900 - - - $900
-
kWh
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$799
Cost:
$400
- - $799 207 -
-
kWh
$799
207
MMBtu
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$146
Cost:
$310
- - $146 38 -
-
kWh
$146
38
MMBtu
05: 2.5194 REDESIGN PROCESS Savings:
$529
Cost:
$33
- - $529 137 -
-
kWh
$529
137
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,273
Cost:
$10,000
- - $4,273 1,107 -
-
kWh
$4,273
1,107
MMBtu
TOTAL RECOMMENDED Savings:
$13,008
Cost:
$14,120
$900 - $12,108 3,137 $900
-
kWh
$12,108
3,137
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas