IAC logo
IAC Assessment: OK0167
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0167
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1985
Principal Product WOOD MOLDINGS
NAICS n/a
SIC 2431 - Millwork
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 0
Annual Production 2,000 Thousand Feet
Production Hrs. Annual 2,340
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,374 283,998 kWh $0.07
Natural Gas $9,672 2,298 MMBtu $4.21
TOTAL ENERGY COSTS $29,046
RECOMMENDED SAVINGS* $3,675 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$212
Cost:
-
$212 3,224 - - $212
3,224
kWh
-
-
MMBtu
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$187
Cost:
$70
$187 3,224 - - $187
3,224
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$82
Cost:
$80
$82 1,465 - - $82
1,465
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$152
Cost:
$902
$152 2,638 - - $152
2,638
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$138
Cost:
$200
- - $138 33 -
-
kWh
$138
33
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,904
Cost:
$600
- - $2,904 690 -
-
kWh
$2,904
690
MMBtu
TOTAL RECOMMENDED Savings:
$3,675
Cost:
$1,852
$633 10,551 $3,042 723 $633
10,551
kWh
$3,042
723
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas