IAC Assessment: OK0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1985
Principal Product LATEX CATHETERS
NAICS n/a
SIC 3841 - Surgical And Medical Instruments
Sales $1,000,000-$5,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 5,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,853 1,599,941 kWh $0.05
Natural Gas $14,165 3,479 MMBtu $4.07
TOTAL ENERGY COSTS $88,018
RECOMMENDED SAVINGS* $2,291 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,717
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$209
Cost:
$300
$209 6,448 - - $209
6,448
kWh
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$29
Cost:
$80
$29 879 - - $29
879
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$365
Cost:
$580
- - $365 104 -
-
kWh
$365
104
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$52
Cost:
$27
- - $52 15 -
-
kWh
$52
15
MMBtu
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$232
Cost:
$200
- - $232 66 -
-
kWh
$232
66
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,159
Cost:
$946
$1,159 29,308 - - $1,159
29,308
kWh
-
-
MMBtu
07: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$245
Cost:
$600
$245 7,620 - - $245
7,620
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$2,291
Cost:
$2,733
$1,642 44,255 $649 185 $1,642
44,255
kWh
$649
185
MMBtu
TOTAL IMPLEMENTED Savings:
$1,717
Cost:
$1,853
$1,433 37,807 $284 81 $1,433
37,807
kWh
$284
81
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas