IAC Assessment: OK0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1985
Principal Product PORTA-DRILLING EQUIPMENT
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 10,000,000 Pieces
Production Hrs. Annual 2,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $187,549 3,834,994 kWh $0.05
Natural Gas $99,208 26,904 MMBtu $3.69
TOTAL ENERGY COSTS $286,757
RECOMMENDED SAVINGS* $81,093 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,908
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$14,817
Cost:
-
$2,295 60,961 $12,522 3,421 $2,295
60,961
kWh
$12,522
3,421
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$575
Cost:
$864
$575 9,672 - - $575
9,672
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$485
Cost:
$154
$485 5,862 - - $485
5,862
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,663
Cost:
$2,050
$4,663 78,253 - - $4,663
78,253
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$49,981
Cost:
$1,200
- - $49,981 13,545 -
-
kWh
$49,981
13,545
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$476
Cost:
$100
- - $476 129 -
-
kWh
$476
129
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,911
Cost:
$600
- - $2,911 789 -
-
kWh
$2,911
789
MMBtu
08: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$5,133
Cost:
$2,148
- - $5,133 1,391 -
-
kWh
$5,133
1,391
MMBtu
09: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$2,052
Cost:
$1,893
- - $2,052 556 -
-
kWh
$2,052
556
MMBtu
TOTAL RECOMMENDED Savings:
$81,093
Cost:
$9,009
$8,018 154,748 $73,075 19,831 $8,018
154,748
kWh
$73,075
19,831
MMBtu
TOTAL IMPLEMENTED Savings:
$73,908
Cost:
$4,968
$8,018 154,748 $65,890 17,884 $8,018
154,748
kWh
$65,890
17,884
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas