IAC logo
IAC Assessment: OK0177
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0177
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1985
Principal Product FLOUR & MILL FEED
NAICS n/a
SIC 2041 - Flour And Other Grain Mill Products
Sales $50,000,000-$100,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 43,000,000 Pounds
Production Hrs. Annual 7,680
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $779,800 18,825,030 kWh $0.04
Natural Gas $27,888 7,525 MMBtu $3.71
TOTAL ENERGY COSTS $807,688
RECOMMENDED SAVINGS* $20,925 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,499
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,611
Cost:
$1,080
$1,611 48,945 - - - - $1,611
48,945
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$594
Cost:
$559
$594 15,240 - - - - $594
15,240
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14,014
Cost:
$1,950
$14,014 366,647 - - - - $14,014
366,647
kWh
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$493
Cost:
$250
$493 10,551 - - - - $493
10,551
kWh
-
-
MMBtu
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$505
Cost:
-
$505 13,189 - - - - $505
13,189
kWh
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$280
Cost:
$165
- - $280 76 - - -
-
kWh
$280
76
MMBtu
-
-
$
07: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$3,428
Cost:
$625
- - $2,468 667 $960 - -
-
kWh
$2,468
667
MMBtu
$960
-
$
TOTAL RECOMMENDED Savings:
$20,925
Cost:
$4,629
$17,217 454,572 $2,748 743 $960 - $17,217
454,572
kWh
$2,748
743
MMBtu
$960
-
$
TOTAL IMPLEMENTED Savings:
$16,499
Cost:
$3,754
$16,219 430,832 $280 76 - - $16,219
430,832
kWh
$280
76
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes