IAC Assessment: OK0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1986
Principal Product GALVANIZED POLES
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 2,550 Pieces
Production Hrs. Annual 2,125
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,124 1,786,049 kWh $0.05
Natural Gas $135,140 37,219 MMBtu $3.63
TOTAL ENERGY COSTS $227,264
RECOMMENDED SAVINGS* $88,595 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,817
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,090
Cost:
$160
$3,090 44,842 - - - - $3,090
44,842
kWh
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$19,130
Cost:
$14,112
- - $19,130 5,270 - - -
-
kWh
$19,130
5,270
MMBtu
-
-
$
03: 2.2514 COVER OPEN TANKS Savings:
$63,648
Cost:
$7,814
- - $63,648 17,534 - - -
-
kWh
$63,648
17,534
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,727
Cost:
$5,271
$3,182 46,307 - - $(-455) - $3,182
46,307
kWh
-
-
MMBtu
$(-455)
-
$
TOTAL RECOMMENDED Savings:
$88,595
Cost:
$27,357
$6,272 91,149 $82,778 22,804 $(-455) - $6,272
91,149
kWh
$82,778
22,804
MMBtu
$(-455)
-
$
TOTAL IMPLEMENTED Savings:
$5,817
Cost:
$5,431
$6,272 91,149 - - $(-455) - $6,272
91,149
kWh
-
-
MMBtu
$(-455)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes