IAC logo
IAC Assessment: OK0204
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1986
Principal Product NATURAL GAS COMPRESSORS
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 0
Annual Production 36 Pieces
Production Hrs. Annual 2,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,435 1,752,931 kWh $0.05
Natural Gas $32,425 8,316 MMBtu $3.90
TOTAL ENERGY COSTS $122,860
RECOMMENDED SAVINGS* $10,436 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,436
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$178
Cost:
$144
$178 1,758 - - - - $178
1,758
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$372
Cost:
-
$622 16,999 - - $(-250) - $622
16,999
kWh
-
-
MMBtu
$(-250)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,377
Cost:
$545
$1,377 20,516 - - - - $1,377
20,516
kWh
-
-
MMBtu
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$635
Cost:
$100
$635 17,585 - - - - $635
17,585
kWh
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$690
Cost:
-
- - $690 177 - - -
-
kWh
$690
177
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,184
Cost:
$4,000
- - $7,184 1,842 - - -
-
kWh
$7,184
1,842
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,436
Cost:
$4,789
$2,812 56,858 $7,874 2,019 $(-250) - $2,812
56,858
kWh
$7,874
2,019
MMBtu
$(-250)
-
$
TOTAL IMPLEMENTED Savings:
$10,436
Cost:
$4,789
$2,812 56,858 $7,874 2,019 $(-250) - $2,812
56,858
kWh
$7,874
2,019
MMBtu
$(-250)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes