IAC Assessment: OK0214
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0214
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1987
Principal Product SHELL & TUBE HEAT EXCHANGERS
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $5,000,000-$10,000,000
# of Employees 107
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,300
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,303 2,247,069 kWh $0.05
Natural Gas $30,501 8,166 MMBtu $3.74
TOTAL ENERGY COSTS $143,804
RECOMMENDED SAVINGS* $23,672 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,002
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$57
Cost:
$43
$57 1,172 - - - - $57
1,172
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,929
Cost:
$24,647
$10,966 273,154 - - $(-37) - $10,966
273,154
kWh
-
-
MMBtu
$(-37)
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$638
Cost:
-
$578 18,757 - - $60 - $578
18,757
kWh
-
-
MMBtu
$60
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,800
Cost:
$1,155
- - $7,800 1,950 - - -
-
kWh
$7,800
1,950
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,319
Cost:
-
$2,629 84,701 - - $(-310) - $2,629
84,701
kWh
-
-
MMBtu
$(-310)
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$870
Cost:
$230
$90 2,931 - - $780 - $90
2,931
kWh
-
-
MMBtu
$780
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,059
Cost:
$450
$1,059 34,291 - - - - $1,059
34,291
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,672
Cost:
$26,525
$15,379 415,006 $7,800 1,950 $493 - $15,379
415,006
kWh
$7,800
1,950
MMBtu
$493
-
$
TOTAL IMPLEMENTED Savings:
$15,002
Cost:
$25,140
$15,289 412,075 - - $(-287) - $15,289
412,075
kWh
-
-
MMBtu
$(-287)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes