IAC logo
IAC Assessment: OK0231
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0231
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1987
Principal Product TRANSFORMERS
NAICS n/a
SIC 3612 - Transformers, Except Electronic
Sales $5,000,000-$10,000,000
# of Employees 83
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,032
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,636 1,158,558 kWh $0.06
Natural Gas $31,125 11,350 MMBtu $2.74
TOTAL ENERGY COSTS $98,761
RECOMMENDED SAVINGS* $6,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,730
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$604
Cost:
$227
$604 11,723 - - - - $604
11,723
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,188
Cost:
$1,372
$1,188 25,791 - - - - $1,188
25,791
kWh
-
-
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,831
Cost:
$1,300
- - $3,831 1,398 - - -
-
kWh
$3,831
1,398
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$107
Cost:
-
$227 7,034 - - $(-120) - $227
7,034
kWh
-
-
MMBtu
$(-120)
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$192
Cost:
$500
$297 9,086 $(-105) (-38) - - $297
9,086
kWh
$(-105)
(-38)
MMBtu
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$836
Cost:
$145
- - $836 305 - - -
-
kWh
$836
305
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$6,758
Cost:
$3,544
$2,316 53,634 $4,562 1,665 $(-120) - $2,316
53,634
kWh
$4,562
1,665
MMBtu
$(-120)
-
$
TOTAL IMPLEMENTED Savings:
$5,730
Cost:
$2,899
$2,019 44,548 $3,831 1,398 $(-120) - $2,019
44,548
kWh
$3,831
1,398
MMBtu
$(-120)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes