IAC logo
IAC Assessment: OK0232
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0232
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1987
Principal Product STEEL BUILDINGS
NAICS n/a
SIC 3449 - Miscellaneous Metal Work
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,890 421,454 kWh $0.05
Natural Gas $13,517 3,050 MMBtu $4.43
TOTAL ENERGY COSTS $34,407
RECOMMENDED SAVINGS* $3,022 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,847
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,206
Cost:
$4,449
$2,206 65,651 - - $2,206
65,651
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$46
Cost:
$68
$46 586 - - $46
586
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$451
Cost:
$225
$451 14,947 - - $451
14,947
kWh
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$129
Cost:
$200
$353 11,723 $(-224) (-50) $353
11,723
kWh
$(-224)
(-50)
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$190
Cost:
-
$190 2,638 - - $190
2,638
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$3,022
Cost:
$4,942
$3,246 95,545 $(-224) (-50) $3,246
95,545
kWh
$(-224)
(-50)
MMBtu
TOTAL IMPLEMENTED Savings:
$2,847
Cost:
$4,674
$2,847 83,236 - - $2,847
83,236
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas