IAC logo
IAC Assessment: OK0242
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0242
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1987
Principal Product IODINE
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 27
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,941,191 44,481,536 kWh $0.04
Natural Gas $76,461 63,718 MMBtu $1.20
TOTAL ENERGY COSTS $2,017,652
RECOMMENDED SAVINGS* $560,769 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,747
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$557,022
Cost:
$852,179
$771,100 17,379,836 $(-166,078) (-138,398) $(-48,000) - $771,100
17,379,836
kWh
$(-166,078)
(-138,398)
MMBtu
$(-48,000)
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,249
Cost:
$400
$3,249 55,979 - - - - $3,249
55,979
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$498
Cost:
$209
$498 8,792 - - - - $498
8,792
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$560,769
Cost:
$852,788
$774,847 17,444,607 $(-166,078) (-138,398) $(-48,000) - $774,847
17,444,607
kWh
$(-166,078)
(-138,398)
MMBtu
$(-48,000)
-
$
TOTAL IMPLEMENTED Savings:
$3,747
Cost:
$609
$3,747 64,771 - - - - $3,747
64,771
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes