IAC logo
IAC Assessment: OK0249
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0249
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1988
Principal Product METAL FABRICATIONS
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 200 Pieces
Production Hrs. Annual 2,016
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,324 860,785 kWh $0.05
Natural Gas $16,057 3,612 MMBtu $4.45
TOTAL ENERGY COSTS $59,381
RECOMMENDED SAVINGS* $5,931 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,871
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$956
Cost:
-
$956 16,120 - - - - $956
16,120
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,980
Cost:
-
$3,320 55,979 - - $(-340) - $3,320
55,979
kWh
-
-
MMBtu
$(-340)
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,682
Cost:
$1,800
- - $1,682 378 - - -
-
kWh
$1,682
378
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$209
Cost:
$490
$209 3,517 - - - - $209
3,517
kWh
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$104
Cost:
-
$104 1,758 - - - - $104
1,758
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,931
Cost:
$2,290
$4,589 77,374 $1,682 378 $(-340) - $4,589
77,374
kWh
$1,682
378
MMBtu
$(-340)
-
$
TOTAL IMPLEMENTED Savings:
$4,871
Cost:
$2,290
$3,529 59,496 $1,682 378 $(-340) - $3,529
59,496
kWh
$1,682
378
MMBtu
$(-340)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes