IAC logo
IAC Assessment: OK0255
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0255
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1988
Principal Product PIPELINE SERVICE EQUIPMENT
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 7,280
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,354 2,867,233 kWh $0.05
Natural Gas $37,324 11,590 MMBtu $3.22
TOTAL ENERGY COSTS $178,678
RECOMMENDED SAVINGS* $24,728 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,196
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$11,528
Cost:
$12,900
- - $11,528 3,580 - - -
-
kWh
$11,528
3,580
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,134
Cost:
$8,160
$2,273 55,979 - - $861 - $2,273
55,979
kWh
-
-
MMBtu
$861
-
$
03: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$7,590
Cost:
$21,879
$6,431 128,370 - - $1,159 - $6,431
128,370
kWh
-
-
MMBtu
$1,159
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$612
Cost:
$756
$612 12,309 - - - - $612
12,309
kWh
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,196
Cost:
$1,105
- - $1,196 372 - - -
-
kWh
$1,196
372
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$668
Cost:
-
$728 23,447 - - $(-60) - $728
23,447
kWh
-
-
MMBtu
$(-60)
-
$
TOTAL RECOMMENDED Savings:
$24,728
Cost:
$44,800
$10,044 220,105 $12,724 3,952 $1,960 - $10,044
220,105
kWh
$12,724
3,952
MMBtu
$1,960
-
$
TOTAL IMPLEMENTED Savings:
$12,196
Cost:
$12,900
$728 23,447 $11,528 3,580 $(-60) - $728
23,447
kWh
$11,528
3,580
MMBtu
$(-60)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes