IAC Assessment: OK0256
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0256
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1988
Principal Product CUSTOM INJECTION MOLDING
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 10,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $273,795 6,963,951 kWh $0.04
Natural Gas $12,951 3,918 MMBtu $3.31
TOTAL ENERGY COSTS $286,746
RECOMMENDED SAVINGS* $13,300 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,598
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$210
Cost:
$600
- - $210 63 - - -
-
kWh
$210
63
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,378
Cost:
$3,960
$1,235 38,687 - - $143 - $1,235
38,687
kWh
-
-
MMBtu
$143
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$230
Cost:
$20
$230 7,327 - - - - $230
7,327
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$350
Cost:
$128
$350 10,551 - - - - $350
10,551
kWh
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$515
Cost:
$240
$515 12,016 - - - - $515
12,016
kWh
-
-
MMBtu
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$523
Cost:
$180
$523 16,120 - - - - $523
16,120
kWh
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,776
Cost:
$739
$6,776 282,239 - - - - $6,776
282,239
kWh
-
-
MMBtu
-
-
$
08: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,318
Cost:
$7,200
$3,318 138,335 - - - - $3,318
138,335
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,300
Cost:
$13,067
$12,947 505,275 $210 63 $143 - $12,947
505,275
kWh
$210
63
MMBtu
$143
-
$
TOTAL IMPLEMENTED Savings:
$1,598
Cost:
$1,148
$1,388 38,687 $210 63 - - $1,388
38,687
kWh
$210
63
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes