IAC Assessment: OK0258
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0258
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1988
Principal Product CORRUGATED PACKAGING
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 126
Plant Area (Sq.Ft.) 0
Annual Production 551 Thousand Feet
Production Hrs. Annual 6,000
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,584 3,796,014 kWh $0.05
Natural Gas $154,394 51,429 MMBtu $3.00
TOTAL ENERGY COSTS $328,978
RECOMMENDED SAVINGS* $22,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,333
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$93
Cost:
$80
$93 2,345 - - - - $93
2,345
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,747
Cost:
$25,520
$5,147 140,973 - - $3,600 - $5,147
140,973
kWh
-
-
MMBtu
$3,600
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$210
Cost:
$184
- - $210 70 - - -
-
kWh
$210
70
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,386
Cost:
$585
- - $1,386 462 - - -
-
kWh
$1,386
462
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$589
Cost:
$650
- - $589 196 - - -
-
kWh
$589
196
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$432
Cost:
$1,100
$432 - - - - - $432
-
kWh
-
-
MMBtu
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$11,493
Cost:
-
- - $11,493 3,831 - - -
-
kWh
$11,493
3,831
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$22,950
Cost:
$28,119
$5,672 143,318 $13,678 4,559 $3,600 - $5,672
143,318
kWh
$13,678
4,559
MMBtu
$3,600
-
$
TOTAL IMPLEMENTED Savings:
$20,333
Cost:
$25,600
$5,240 143,318 $11,493 3,831 $3,600 - $5,240
143,318
kWh
$11,493
3,831
MMBtu
$3,600
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes