IAC logo
IAC Assessment: OK0271
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0271
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1988
Principal Product MEN AND BOYS JEANS
NAICS n/a
SIC 2325 - Men's and Boys' Separate Trousers and Slacks
Sales $10,000,000-$50,000,000
# of Employees 185
Plant Area (Sq.Ft.) 0
Annual Production 220,000 Pieces
Production Hrs. Annual 2,500
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,723 592,321 kWh $0.07
Natural Gas $2,772 583 MMBtu $4.75
TOTAL ENERGY COSTS $42,495
RECOMMENDED SAVINGS* $3,480 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,244
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$307
Cost:
$375
$307 4,689 - - - - $307
4,689
kWh
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,159
Cost:
$1,070
- - $1,159 261 - - -
-
kWh
$1,159
261
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,077
Cost:
$1,055
- - $1,077 242 - - -
-
kWh
$1,077
242
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$180
Cost:
-
$180 2,052 - - - - $180
2,052
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26
Cost:
$32
$26 586 - - - - $26
586
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$731
Cost:
-
$801 12,309 - - $(-70) - $801
12,309
kWh
-
-
MMBtu
$(-70)
-
$
TOTAL RECOMMENDED Savings:
$3,480
Cost:
$2,532
$1,314 19,636 $2,236 503 $(-70) - $1,314
19,636
kWh
$2,236
503
MMBtu
$(-70)
-
$
TOTAL IMPLEMENTED Savings:
$1,244
Cost:
$407
$1,314 19,636 - - $(-70) - $1,314
19,636
kWh
-
-
MMBtu
$(-70)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes