IAC logo
IAC Assessment: OK0296
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0296
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1989
Principal Product BOOK DEPOSIT BOXES
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 50 Pieces
Production Hrs. Annual 4,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,032 1,173,505 kWh $0.05
Natural Gas $15,977 4,986 MMBtu $3.20
TOTAL ENERGY COSTS $80,009
RECOMMENDED SAVINGS* $7,263 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,263
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,120
Cost:
$5,685
$5,436 95,838 $(-316) - $5,436
95,838
kWh
$(-316)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$771
Cost:
$1,425
$659 11,430 $112 - $659
11,430
kWh
$112
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$156
Cost:
-
$156 2,931 - - $156
2,931
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$180
Cost:
$155
$180 2,931 - - $180
2,931
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$542
Cost:
$1,336
$542 10,844 - - $542
10,844
kWh
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$494
Cost:
-
$644 19,050 $(-150) - $644
19,050
kWh
$(-150)
-
$
TOTAL RECOMMENDED Savings:
$7,263
Cost:
$8,601
$7,617 143,024 $(-354) - $7,617
143,024
kWh
$(-354)
-
$
TOTAL IMPLEMENTED Savings:
$7,263
Cost:
$8,601
$7,617 143,024 $(-354) - $7,617
143,024
kWh
$(-354)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes