IAC logo
IAC Assessment: OK0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1989
Principal Product PORK & BEEF
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 8,500,000 Pounds
Production Hrs. Annual 3,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,521 2,034,877 kWh $0.05
Natural Gas $36,093 12,414 MMBtu $2.91
TOTAL ENERGY COSTS $136,614
RECOMMENDED SAVINGS* $11,543 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,776
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,160
Cost:
$5,523
$(-147) (-2,931) $2,307 796 - - $(-147)
(-2,931)
kWh
$2,307
796
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,738
Cost:
$1,478
$3,607 69,168 - - $131 - $3,607
69,168
kWh
-
-
MMBtu
$131
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$233
Cost:
$123
$233 4,103 - - - - $233
4,103
kWh
-
-
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,607
Cost:
$2,500
$1,607 - - - - - $1,607
-
kWh
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,788
Cost:
-
$2,788 64,478 - - - - $2,788
64,478
kWh
-
-
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,017
Cost:
$2,289
- - $1,017 281 - - -
-
kWh
$1,017
281
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,543
Cost:
$11,913
$8,088 134,818 $3,324 1,077 $131 - $8,088
134,818
kWh
$3,324
1,077
MMBtu
$131
-
$
TOTAL IMPLEMENTED Savings:
$7,776
Cost:
$3,890
$6,628 137,749 $1,017 281 $131 - $6,628
137,749
kWh
$1,017
281
MMBtu
$131
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes