IAC logo
IAC Assessment: OK0304
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0304
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1990
Principal Product FISHING REELS
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 5,500,000 Pieces
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $181,647 3,516,999 kWh $0.05
Natural Gas $8,339 2,409 MMBtu $3.46
TOTAL ENERGY COSTS $189,986
RECOMMENDED SAVINGS* $17,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,060
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$880
Cost:
$355
$880 13,189 - - - - $880
13,189
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$805
Cost:
$135
$805 15,826 - - - - $805
15,826
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$224
Cost:
-
$384 12,896 - - $(-160) - $384
12,896
kWh
-
-
MMBtu
$(-160)
-
$
04: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$10,140
Cost:
$17,000
$10,140 - - - - - $10,140
-
kWh
-
-
MMBtu
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,151
Cost:
$1,200
$2,865 102,872 $2,286 694 - - $2,865
102,872
kWh
$2,286
694
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$17,200
Cost:
$18,690
$15,074 144,783 $2,286 694 $(-160) - $15,074
144,783
kWh
$2,286
694
MMBtu
$(-160)
-
$
TOTAL IMPLEMENTED Savings:
$7,060
Cost:
$1,690
$4,934 144,783 $2,286 694 $(-160) - $4,934
144,783
kWh
$2,286
694
MMBtu
$(-160)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes