IAC Assessment: OK0311
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0311
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1990
Principal Product AMUSEMENT RIDE EQUIPMENT
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 132 Pieces
Production Hrs. Annual 5,200
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $220,424 2,751,172 kWh $0.08
Natural Gas $73,002 23,625 MMBtu $3.09
TOTAL ENERGY COSTS $293,426
RECOMMENDED SAVINGS* $14,481 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,256
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,239
Cost:
$2,150
$1,538 21,395 $1,701 551 - - $1,538
21,395
kWh
$1,701
551
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,549
Cost:
$750
- - $2,549 825 - - -
-
kWh
$2,549
825
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,942
Cost:
$1,641
- - $2,942 952 - - -
-
kWh
$2,942
952
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$578
Cost:
$190
$578 8,206 - - - - $578
8,206
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,396
Cost:
-
$2,546 35,463 - - $(-150) - $2,546
35,463
kWh
-
-
MMBtu
$(-150)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,283
Cost:
$632
$1,283 14,361 - - - - $1,283
14,361
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,494
Cost:
$975
$1,525 16,999 - - $(-31) - $1,525
16,999
kWh
-
-
MMBtu
$(-31)
-
$
TOTAL RECOMMENDED Savings:
$14,481
Cost:
$6,338
$7,470 96,424 $7,192 2,328 $(-181) - $7,470
96,424
kWh
$7,192
2,328
MMBtu
$(-181)
-
$
TOTAL IMPLEMENTED Savings:
$10,256
Cost:
$4,065
$6,187 82,063 $4,250 1,376 $(-181) - $6,187
82,063
kWh
$4,250
1,376
MMBtu
$(-181)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes