IAC logo
IAC Assessment: OK0313
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0313
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1990
Principal Product URANIUM HEXAFLUORIDE
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 0
Annual Production 10,000 Tons
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,248,008 56,514,948 kWh $0.02
Natural Gas $435,530 247,172 MMBtu $1.76
TOTAL ENERGY COSTS $1,683,538
RECOMMENDED SAVINGS* $43,991 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,006
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,286
Cost:
$7,300
$4,286 147,128 - - $4,286
147,128
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$19,725
Cost:
-
- - $19,725 13,150 -
-
kWh
$19,725
13,150
MMBtu
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$890
Cost:
$614
- - $890 593 -
-
kWh
$890
593
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,985
Cost:
$16,500
$2,985 102,579 - - $2,985
102,579
kWh
-
-
MMBtu
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$13,867
Cost:
$1,650
- - $13,867 9,245 -
-
kWh
$13,867
9,245
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,238
Cost:
$5,800
- - $2,238 1,492 -
-
kWh
$2,238
1,492
MMBtu
TOTAL RECOMMENDED Savings:
$43,991
Cost:
$31,864
$7,271 249,707 $36,720 24,480 $7,271
249,707
kWh
$36,720
24,480
MMBtu
TOTAL IMPLEMENTED Savings:
$41,006
Cost:
$15,364
$4,286 147,128 $36,720 24,480 $4,286
147,128
kWh
$36,720
24,480
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas