IAC logo
IAC Assessment: OK0326
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0326
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1990
Principal Product GAS COMPRESSOR ASSEMBLY
NAICS n/a
SIC 3563 - Air And Gas Compressors
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 198 Pieces
Production Hrs. Annual 8,500
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,674 2,537,515 kWh $0.05
Natural Gas $61,233 21,253 MMBtu $2.88
TOTAL ENERGY COSTS $191,907
RECOMMENDED SAVINGS* $3,856 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,200
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,211
Cost:
$1,382
- - $1,211 420 - - -
-
kWh
$1,211
420
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,545
Cost:
-
$1,715 47,479 - - $(-170) - $1,715
47,479
kWh
-
-
MMBtu
$(-170)
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$518
Cost:
$904
$(-27) (-879) $545 189 - - $(-27)
(-879)
kWh
$545
189
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$138
Cost:
$85
$138 2,345 - - - - $138
2,345
kWh
-
-
MMBtu
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$357
Cost:
$150
$334 5,569 - - $23 - $334
5,569
kWh
-
-
MMBtu
$23
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$87
Cost:
-
$87 1,465 - - - - $87
1,465
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$3,856
Cost:
$2,521
$2,247 55,979 $1,756 609 $(-147) - $2,247
55,979
kWh
$1,756
609
MMBtu
$(-147)
-
$
TOTAL IMPLEMENTED Savings:
$3,200
Cost:
$1,532
$2,136 54,513 $1,211 420 $(-147) - $2,136
54,513
kWh
$1,211
420
MMBtu
$(-147)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes