Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1990
Principal Product EXPANDABLE POLYSTYRENE
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales <$500,000
# of Employees 12
Plant Area (Sq.Ft.) 0
Annual Production 1,300,000 Pounds
Production Hrs. Annual 2,210
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $12,422 167,057 kWh $0.07
Natural Gas $21,905 6,663 MMBtu $3.29
TOTAL ENERGY COSTS $34,327
RECOMMENDED SAVINGS* $4,943 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,407
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1222 INSTALL TURBULATORS Savings:
$536
Cost:
$1,550
- - $536 170 - - -
-
kWh
$536
170
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$83
Cost:
$57
$83 2,931 - - - - $83
2,931
kWh
-
-
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,671
Cost:
-
$1,298 44,256 - - $373 - $1,298
44,256
kWh
-
-
MMBtu
$373
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$290
Cost:
-
$290 9,965 - - - - $290
9,965
kWh
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,363
Cost:
$450
- - $2,363 750 - - -
-
kWh
$2,363
750
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$4,943
Cost:
$2,057
$1,671 57,152 $2,899 920 $373 - $1,671
57,152
kWh
$2,899
920
MMBtu
$373
-
$
TOTAL IMPLEMENTED Savings:
$4,407
Cost:
$507
$1,671 57,152 $2,363 750 $373 - $1,671
57,152
kWh
$2,363
750
MMBtu
$373
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes