IAC logo
IAC Assessment: OK0339
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0339
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1991
Principal Product CUSTOM MOTORCOACHES
NAICS n/a
SIC 3716 - Motor Homes
Sales $10,000,000-$50,000,000
# of Employees 121
Plant Area (Sq.Ft.) 0
Annual Production 34 Pieces
Production Hrs. Annual 2,250
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,529 695,487 kWh $0.06
Natural Gas $30,381 7,280 MMBtu $4.17
TOTAL ENERGY COSTS $71,910
RECOMMENDED SAVINGS* $18,396 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,396
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$11,191
Cost:
$3,500
- - $11,191 2,682 - - -
-
kWh
$11,191
2,682
MMBtu
-
-
$
02: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$4,869
Cost:
$5,000
$2,408 171,161 $2,461 590 - - $2,408
171,161
kWh
$2,461
590
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,840
Cost:
-
$2,040 66,823 - - $(-200) - $2,040
66,823
kWh
-
-
MMBtu
$(-200)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$496
Cost:
$441
$496 9,379 - - - - $496
9,379
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,396
Cost:
$8,941
$4,944 247,363 $13,652 3,272 $(-200) - $4,944
247,363
kWh
$13,652
3,272
MMBtu
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
$18,396
Cost:
$8,941
$4,944 247,363 $13,652 3,272 $(-200) - $4,944
247,363
kWh
$13,652
3,272
MMBtu
$(-200)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes