IAC Assessment: OK0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1991
Principal Product VINYL FLOOR COVERING
NAICS n/a
SIC 3996 - Hard Surface Floor Coverings, Nec
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 154 Thousand Feet
Production Hrs. Annual 4,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $579,310 13,649,180 kWh $0.04
Natural Gas $328,854 151,090 MMBtu $2.18
TOTAL ENERGY COSTS $908,164
RECOMMENDED SAVINGS* $69,730 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,730
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$355
Cost:
$245
$145 4,103 $210 100 $145
4,103
kWh
$210
100
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,004
Cost:
$6,200
$4,004 77,374 - - $4,004
77,374
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,241
Cost:
$791
$1,241 25,205 - - $1,241
25,205
kWh
-
-
MMBtu
04: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$14,080
Cost:
$38,500
$14,080 394,490 - - $14,080
394,490
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,481
Cost:
$1,800
- - $1,481 705 -
-
kWh
$1,481
705
MMBtu
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$19,001
Cost:
$13,510
$19,001 535,170 - - $19,001
535,170
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$846
Cost:
$1,336
$846 12,896 - - $846
12,896
kWh
-
-
MMBtu
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$443
Cost:
$740
- - $443 211 -
-
kWh
$443
211
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,226
Cost:
$2,900
$444 12,309 $1,782 849 $444
12,309
kWh
$1,782
849
MMBtu
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$26,053
Cost:
$16,500
$(-1,079) (-19,343) $27,132 12,920 $(-1,079)
(-19,343)
kWh
$27,132
12,920
MMBtu
TOTAL RECOMMENDED Savings:
$69,730
Cost:
$82,522
$38,682 1,042,204 $31,048 14,785 $38,682
1,042,204
kWh
$31,048
14,785
MMBtu
TOTAL IMPLEMENTED Savings:
$69,730
Cost:
$82,522
$38,682 1,042,204 $31,048 14,785 $38,682
1,042,204
kWh
$31,048
14,785
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas