IAC logo
IAC Assessment: OK0350
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0350
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1991
Principal Product AIRCRAFT PARTS
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 850
Plant Area (Sq.Ft.) 0
Annual Production 1,265,000 Pieces
Production Hrs. Annual 4,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $703,199 14,726,260 kWh $0.05
Natural Gas $202,259 89,068 MMBtu $2.27
TOTAL ENERGY COSTS $905,458
RECOMMENDED SAVINGS* $39,775 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,574
Cost:
$1,300
- - $3,574 1,733 - - -
-
kWh
$3,574
1,733
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,981
Cost:
$2,550
- - $9,981 4,845 - - -
-
kWh
$9,981
4,845
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$162
Cost:
$330
$162 4,689 - - - - $162
4,689
kWh
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,525
Cost:
$25,022
$8,525 241,794 - - - - $8,525
241,794
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,499
Cost:
$35,947
$16,499 313,599 - - - - $16,499
313,599
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$914
Cost:
-
$1,064 30,188 - - $(-150) - $1,064
30,188
kWh
-
-
MMBtu
$(-150)
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$120
Cost:
-
$305 6,448 - - $(-185) - $305
6,448
kWh
-
-
MMBtu
$(-185)
-
$
TOTAL RECOMMENDED Savings:
$39,775
Cost:
$65,149
$26,555 596,718 $13,555 6,578 $(-335) - $26,555
596,718
kWh
$13,555
6,578
MMBtu
$(-335)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes