IAC Assessment: OK0361
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0361
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1991
Principal Product TRACTORS, TRAILERS
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 380
Plant Area (Sq.Ft.) 0
Annual Production 7,800 Pieces
Production Hrs. Annual 3,840
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $489,589 7,065,651 kWh $0.07
Natural Gas $97,528 32,437 MMBtu $3.01
TOTAL ENERGY COSTS $587,117
RECOMMENDED SAVINGS* $19,435 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$307
Cost:
$403
- - $307 110 - - -
-
kWh
$307
110
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,285
Cost:
-
$1,219 17,585 - - $66 - $1,219
17,585
kWh
-
-
MMBtu
$66
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,012
Cost:
$1,050
- - $3,012 1,084 - - -
-
kWh
$3,012
1,084
MMBtu
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$10,521
Cost:
$13,526
$(-164) (-4,103) $10,685 3,845 - - $(-164)
(-4,103)
kWh
$10,685
3,845
MMBtu
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,198
Cost:
$107
$1,198 17,292 - - - - $1,198
17,292
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$756
Cost:
-
$900 12,896 - - $(-144) - $900
12,896
kWh
-
-
MMBtu
$(-144)
-
$
07: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$2,356
Cost:
$4,600
$2,356 33,998 - - - - $2,356
33,998
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,435
Cost:
$19,686
$5,509 77,668 $14,004 5,039 $(-78) - $5,509
77,668
kWh
$14,004
5,039
MMBtu
$(-78)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes