IAC logo
IAC Assessment: OK0364
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0364
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1992
Principal Product SEAMLESS COPPER TUBING
NAICS n/a
SIC 3351 - Copper Rolling And Drawing
Sales $50,000,000-$100,000,000
# of Employees 218
Plant Area (Sq.Ft.) 0
Annual Production 50,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,122,121 24,415,885 kWh $0.05
Natural Gas $365,077 173,824 MMBtu $2.10
TOTAL ENERGY COSTS $1,487,198
RECOMMENDED SAVINGS* $211,173 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $211,173
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,452
Cost:
$3,600
$1,452 27,843 - - $1,452
27,843
kWh
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$104
Cost:
-
$293 4,396 $(-189) - $293
4,396
kWh
$(-189)
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$73,231
Cost:
$77,446
$73,231 1,664,420 - - $73,231
1,664,420
kWh
-
-
$
04: 2.3312 INSTALL EFFICIENT RECTIFIERS Savings:
$136,386
Cost:
$240,000
$136,386 2,636,577 - - $136,386
2,636,577
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$211,173
Cost:
$321,046
$211,362 4,333,236 $(-189) - $211,362
4,333,236
kWh
$(-189)
-
$
TOTAL IMPLEMENTED Savings:
$211,173
Cost:
$321,046
$211,362 4,333,236 $(-189) - $211,362
4,333,236
kWh
$(-189)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes