IAC logo
IAC Assessment: OK0370
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0370
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1992
Principal Product DINNERWARE, ARTWARE
NAICS n/a
SIC 3269 - Pottery Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 300 Tons
Production Hrs. Annual 3,500
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,961 470,106 kWh $0.07
Natural Gas $42,115 15,160 MMBtu $2.78
TOTAL ENERGY COSTS $76,076
RECOMMENDED SAVINGS* $9,139 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,197
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$463
Cost:
$2,810
$676 8,499 $(-20) (-7) $(-193) - $676
8,499
kWh
$(-20)
(-7)
MMBtu
$(-193)
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,226
Cost:
$70
$2,296 65,064 - - $(-70) - $2,296
65,064
kWh
-
-
MMBtu
$(-70)
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,047
Cost:
$1,000
- - $3,047 1,100 - - -
-
kWh
$3,047
1,100
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,461
Cost:
$405
- - $2,461 889 - - -
-
kWh
$2,461
889
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$942
Cost:
$1,125
$942 - - - - - $942
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,139
Cost:
$5,410
$3,914 73,563 $5,488 1,982 $(-263) - $3,914
73,563
kWh
$5,488
1,982
MMBtu
$(-263)
-
$
TOTAL IMPLEMENTED Savings:
$8,197
Cost:
$4,285
$2,972 73,563 $5,488 1,982 $(-263) - $2,972
73,563
kWh
$5,488
1,982
MMBtu
$(-263)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes