IAC logo
IAC Assessment: OK0376
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0376
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1992
Principal Product TRAILERS, HORSE & CATTLE
NAICS n/a
SIC 3799 - Transportation Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 1,820 Pieces
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,753 1,138,042 kWh $0.07
LPG $8,131 1,007 MMBtu $8.07
TOTAL ENERGY COSTS $89,884
RECOMMENDED SAVINGS* $6,879 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,709
#|Description Savings
Cost
Status Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,222
Cost:
$3,222
$3,372 64,478 - - $(-150) - $3,372
64,478
kWh
-
-
MMBtu
$(-150)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$782
Cost:
$782
$1,017 19,343 - - $(-235) - $1,017
19,343
kWh
-
-
MMBtu
$(-235)
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,133
Cost:
$1,133
$1,133 21,688 - - - - $1,133
21,688
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$777
Cost:
$777
$777 14,947 - - - - $777
14,947
kWh
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$388
Cost:
$388
$388 7,327 - - - - $388
7,327
kWh
-
-
MMBtu
-
-
$
06: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$388
Cost:
$561
- - $388 48 - - -
-
kWh
$388
48
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$189
Cost:
$554
$189 3,517 - - - - $189
3,517
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$6,879
Cost:
$7,417
$6,876 131,300 $388 48 $(-385) - $6,876
131,300
kWh
$388
48
MMBtu
$(-385)
-
$
TOTAL IMPLEMENTED Savings:
$5,709
Cost:
$6,074
$5,859 111,957 - - $(-150) - $5,859
111,957
kWh
-
-
MMBtu
$(-150)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes