IAC logo
IAC Assessment: OK0382
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0382
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1992
Principal Product MUSHROOMS-CANNED & FRESH
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 370
Plant Area (Sq.Ft.) 0
Annual Production 15,000,000 Pounds
Production Hrs. Annual 3,276
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $281,978 7,061,548 kWh $0.04
Natural Gas $375,476 150,666 MMBtu $2.49
TOTAL ENERGY COSTS $657,454
RECOMMENDED SAVINGS* $39,113 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,406
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$345
Cost:
$6,362
$1,458 33,118 - - $(-1,113) - $1,458
33,118
kWh
-
-
MMBtu
$(-1,113)
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$909
Cost:
$606
- - $909 365 - - -
-
kWh
$909
365
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,333
Cost:
$2,790
- - $4,333 1,740 - - -
-
kWh
$4,333
1,740
MMBtu
-
-
$
04: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$12,447
Cost:
$29,926
$2,823 97,890 $9,624 3,865 - - $2,823
97,890
kWh
$9,624
3,865
MMBtu
-
-
$
05: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION Savings:
$20,707
Cost:
$66,000
$20,707 941,383 - - - - $20,707
941,383
kWh
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$372
Cost:
$2,263
$372 8,499 - - - - $372
8,499
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$39,113
Cost:
$107,947
$25,360 1,080,890 $14,866 5,970 $(-1,113) - $25,360
1,080,890
kWh
$14,866
5,970
MMBtu
$(-1,113)
-
$
TOTAL IMPLEMENTED Savings:
$18,406
Cost:
$41,947
$4,653 139,507 $14,866 5,970 $(-1,113) - $4,653
139,507
kWh
$14,866
5,970
MMBtu
$(-1,113)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes